Saturday, February 21, 2009
site #3
There was a variety of activity at site #3 this week. First thing Monday we stripped the forms from the stem wall, and got ready to pour the porch floors . We hauled bricks, and cleaned up,
Site #2
I haven't posted many pictures of site #2 because I just don't get out to the sites much and also forget to send the camera with Kerry. This week I got to download some pictures from the PA group and so can show you how things are looking there. The house is sided and this week got it's coat of paint. Inside the wiring and the plumbing are pretty much done but we are waiting on the sprinkler folks to come and do their job, so we can get inspected once again and move on to the next step.
More site #1
Just a few more pictures of our first house. This first one is coming in the front door, you see the back door and the dining area.
This next picture is looking from the living room, into the kitchen area and the hall, where there is a bathroom on the right, and two bedrooms at the end.
Site #1
We have passed enough inspections and now we are into the inside of the house. This week the insulation was put in and then short work was made of getting the drywall put up. Another inspection and then we could start with the taping and the mudding. The inspector has to come in and make sure there are enough screws in the drywall. There had to be one every seven inches along the edges and seams, and but there can be less in the field.