Work continued on this week, despite some less than ideal conditions. We have a great construction crew, they don't let wind, or rain, or cold deter them from doing their job. Monday was a cool, rainy day, but things were all lined up to pour the basement walls, and so pour they did. In fact, the rain helped us. We got a bigger cement pump and more trucks at our disposal because others cancelled.
Concrete trucks lined up and ready to go, cement pump in place.
Pouring the walls.

Tuesday-----the weather was better and work was more fun. The bracing was removed from around the walls, the rim joist put on and the membrane applied to the outside of the basement.