Wednesday, February 03, 2010

last week

One of the things we have to do on the job sites is make sure there is a large area around the house free of trees and garbage so that there is a buffer should another fire come along. We had cut down and chipped some trees on this site, and the next job was to grind the stumps, so Kerry rented a stump grinder and let the boys at them.
Kerry is the supply man on the job. Sometimes we can get the lumber delivered but this time he went and picked up what we needed for the framing package. Looks like he had a pretty good load.

The "A" house with it's first coat of color.

One end and one side got done before it was time to call it quits for the weekend. Inside the drywall was getting hung and so we will finish that off next week, and after inspection we can get to taping and mudding.
Posted by Picasa

0 Comments:

Post a Comment